Fully Automatic Soft Drinks Mixer & Carbonated Beverage Filling System
Introducing our high-performance Glass Bottle Soda Filling Machine, tailored for the modern beverage industry. Designed for high-volume production, ensuring accurate and efficient filling of glass bottles with soda or other beverages.
| Parameter | Specification |
|---|---|
| Filling Speed | Up to 300 bottles per minute |
| Power Supply | 110V-240V, 50/60Hz |
| Dimensions (L x W x H) | 150cm x 120cm x 170cm |
| Weight | 1500kg |
| Material | Stainless steel and aluminum alloy |
| Maximum Bottle Size | 500ml to 2 liters |
| Accuracy of Fill | ±2% |
| Warranty Period | 2 Years |






Proven Expertise: Specialized in the beverage machinery industry for over 16+ years with exports to 80+ countries.
Certified Quality: National high-tech enterprise with 35 invention patents and CE certification.


1. Installation & Training: Professional engineers available for on-site setup. Includes a two-day training course for operations and maintenance procedures.
2. Warranty: All parts are covered by a Two-Year Warranty against manufacturer defects. We ensure high-quality electronic components from original manufacturers.
3. Commercial Terms: 30% down payment via T/T or L/C; 70% balance before shipment.
A: The machine is designed for carbonated soft drinks, soda water, cola, sparkling fruit juices, and even non-carbonated mineral water or tea, depending on the configuration.
A: We offer various scales of production lines ranging from 2,000 to 30,000 BPH (bottles per hour) to suit both medium and large-scale factories.
A: Yes, we provide solutions for PET plastic bottles, glass bottles, and aluminum cans. The machines are adjustable for sizes ranging from 500ml to 2 liters.
A: All liquid-contact parts are made of high-grade 304 stainless steel. 316 stainless steel is available upon request for specific hygiene requirements.
A: We offer a 24-month warranty and provide 24-hour technical support. Engineers can be dispatched globally for installation, testing, and staff training.
A: Delivery usually takes between 7 to 45 days after receiving the deposit, depending on the complexity of the custom production line configuration.