Mesure 30 Years Factory Brand Hfyl 3000L 6000L 20000L Beverage Drinks Mixer Mixing and CO2 Carbonator Carbonation Machine

Customization: Available
After-sales Service: Overseas Installing Service
Warranty: 1 Year

Product Description

📊

Technical Overview

Model NO.QHS
TypeNegative Pressure Filling
Automatic GradeFully Automatic
Material TypeLiquid
Filling PrincipleNegative Pressure
StructureRotary
PackagingBottle (Glass/PET)
Control SystemPLC + Remote Operation System
PLC BrandSiemens (Germany) / Mitsubishi (Japan)
Capacity Range2000bph - 24000bph
Cap CompatibilityRopp Cap, Crown Cap, Normal Cap
Suitable ProductCarbonated Drinks, Soda, Cola
Dimensions2500*2000*2000 mm
MaterialStainless Steel 304/316
⚙️

Product Description

Application: This professional-grade Carbonating Making Machine is designed for a wide range of beverages including Sparkling Tonic, Soda Water, Cola, Fizzy Beverages, and Energy CSD Drinks. It is ideal for CO2 Syrup Mixing for beverages like ginger ale, cider, tonic water, and fruit-flavored sodas.

The machine is the core equipment for any CSD production plant. It efficiently degasses water, mixes it precisely with syrup, and achieves a 2.5 to 4.5 volume mix of CO2 gas under pressure and low temperature, managed by an advanced heat exchange system. This ensures the consistent taste, flavor, and quality of the final product.

Beverage Mixer 1

PET CSD Drinks

Beverage Mixer 2

CSD Can Drinks

Beverage Mixer 3

Glass Bottle Drinks

📋

Technical Specifications

PHE System

Equipped with PHE: Heat exchange to control mixing temperature.

Sanitary Design

Sanitary Compliance: All pipes and fittings meet strict sanitary requirements.

Parameter Detail
ModelQHS
Capacity1000L ~ 20000L/hr
Carbonating CapacityWithin 8.5g/L (4.2 gas volume)
Mixing Ratio (Syrup:Water)1:3 ~ 1:6
Mixing Temperature0 ~ 4℃
Input Temperature18℃ ~ 25℃
🚀

Complete Line Solutions

We supply turnkey whole line solutions to end users, covering every stage from water treatment to final palletizing.

Syrup System

Water Treatment

Carbonator

Can Filler & Seamer

Glass Bottle Filler

Sleeve Labeler

🛠️

After-Sales Service

  • One-Year Guarantee: Comprehensive one-year guarantee for the equipment and control system, including free wearing parts.
  • Technical Training: Training for your technicians on operation and maintenance to handle common malfunctions.
  • Remote & On-site Support: Long-range guidance via phone or technician dispatch to your factory for on-site fault clearing.
  • Lifetime Service: Favorable pricing for spare parts and technical support for the entire lifespan of the machine.
🏢

Professional Manufacturing

Our manufacturing facility has rich experience in designing and engineering bottling lines for many years. With a dedicated team of mechanical and electrical engineers, we deliver high-quality machinery to over 80 countries worldwide. Our production plant spans 6,000 m² and is equipped with modern processing tools, including multi-axis CNC machines, laser cutters, and advanced welding departments.

We are capable of producing 100% of the parts for our machines, ensuring precise processing of large-size elements like machine frames. Our expertise covers PET bottle blowing, filling machines for various containers, tunnel pasteurizers, and complete turnkey solutions for the beverage industry.

Frequently Asked Questions

When can I expect the engineers for installation?
Once you have prepared the necessary conditions (water, electricity, air supply, and materials), we will dispatch an engineer. This typically happens within 15 days after preparation and visa processing.
What is the typical delivery time after payment?
Production time usually ranges from 30 to 60 days, depending on the specific machine type ordered. Shipping time depends on your destination port.
How are the machines installed and what is the cost?
Our engineers visit your factory to install the machinery and train your staff. The customer is responsible for round-trip airfare, accommodation, and a daily service fee per person.
How long does the installation process take?
Depending on the order complexity, installation and training typically take between 10 to 25 days.
Are spare parts provided with the machine?
Yes, we provide a one-year supply of easily broken spare parts shipped alongside the machine. During the warranty period, we cover the cost of replacement parts and delivery.
Do you provide customized services for specific needs?
Absolutely. We design machines according to your specific requirements regarding material, power, filling type, and bottle shapes, backed by years of industrial experience.

Related Products