| Model NO. | CC-ML004 |
| Certification | CE |
| Automatic Grade | Automatic |
| Application | Milk, Milk Powder |
| Capacity | 500L-10,000L/D |
| End Products | UHT Milk, Pasteurized Milk |
| Raw Material | Fresh Milk/Milk Powder |
| Control | Full/Semi-Automatic |
| Package Size | 200x130x100cm |
| Gross Weight | 600.00kg |
| HS Code | 84830000 |
| Production Capacity | 500PCE/Year |
100g-1000g small pouches. Transported and stored at 2-6ºC with a shelf life of 5-7 days.
200ml-3000ml bottles. Transported and stored at 2-6ºC with a shelf life of 5-7 days.
100g-1000g roof cartons. Transported and stored at 2-6ºC with a shelf life of 5-7 days.
Pasteurized milk uses raw milk as raw material and requires high milk sources. The production process involves heating at 75-85 ºC holding for 10-15 seconds, then cold filling into containers. This low-temperature sterilization retains the natural nutrients and original flavor of the milk.
| Item | Whole Pasteurized | Partially Skimmed | Skimmed |
|---|---|---|---|
| Fat Content | ≥3.1% | 1.0%-2.0% | ≤0.5 |
| Protein Content | ≥2.9 | ||
| Non-fat Milk Solids | ≥8.1% | ||
| Acidity Value | ≤18.0°T | ||
| Total Colonies | ≤30,000cfu/ml | ||
| Escherichia Coli | ≤90MPN/100ml | ||
1. Milk Weighing & Receiving > 2. Cooling > 3. Storage > 4. Pasteurizing > 5. Filling > 6. CIP Cleaning
We provide two options: Integrated cooling tanks for low capacity, or high-efficiency Plate Heat Exchangers (PHE) for continuous high-capacity cooling down to 4ºC.
Full closed SUS304 insulation tanks ensure milk remains spoiled-free. Equipped with temperature sensors, CIP cleaning balls, level flowmeters, and manholes.
The core unit comprising a plate pasteurizer, homogenizer, degasser, and centrifuge separator. The homogenizer (20-25 Mpa) maintains emulsion stability, while the degasser extends shelf life. The system kills pathogenic bacteria (E. coli, Bacillus, Listeria) while preserving protein, vitamins, and enzymes.
Top-tier raw materials and world-class brands for motors and electronic components.
Bulk procurement of raw materials and spare parts significantly reduces manufacturing costs.
Comprehensive pre-shipment testing and engineer-led installation within 10 days of arrival.
Full 2-year warranty with free spare parts provided for any machine issues.