12000 Aluminum Beer Can Per Hour Small Capacity Beer Can Filling Canning Sealing Machine/Production Line

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.
Beer production line
Process
Ferment
Power Source
Electric
Certification
CE / ISO
Automatic Grade
Automatic
Application
Milk, Yogurt, Cheese, Beer
Capacity
1000-4000LPH (Customized)
Power
318V, 50Hz (Optional)
Origin
Jiangsu, China
Package
Wood Carton
Packaging & Delivery
Package Size
146.00cm * 110.00cm * 175.00cm
Gross Weight
300.000kg
Liquor & Beer Production Equipment
Our production lines are designed for high efficiency and quality, suitable for wine, liquor, and beer manufacturing processes.
Main Features
High cost-performance ratio for various production scales.
Excellent abrasion resistance with copper or stainless steel materials.
Full SUS304 construction: Inner jacket 3.0mm, External jacket 2.0mm.
High polishing accuracy up to Ra0.4μm for hygienic standards.
Strict tank pressure testing ensuring safety and durability.
Energy conservation design with low pollution emissions.
Beer Production Line
Canning Machine
Technical Specifications
Item Capacity US Gallon Heating Area Tank Diameter Height
HG-5050L/day14 USG0.15m²550mm1500mm
HG-100100L/day26 USG0.25m²650mm2000mm
HG-300300L/day79 USG0.3m²910mm2300mm
HG-500500L/day132 USG0.5m²1160mm2400mm
HG-10001000L/day264 USG1.0m²1360mm2800mm
HG-20002000L/day528 USG2.0m²1960mm3150mm
HG-50005000L/day1320 USG5.0m²2260mm4400mm
Advanced Automation & Control
Equipment Details
The system adopts PLC control and touch screen operation. It features a high degree of automation, compact structure, and small floor space. It is an ideal solution for canned carbonated liquid beverages and filling production equipment.
Automation System
Equipment Installation
Processing Line Equipment

Specialized equipment for Milk and Yogurt production, ranging from 500L to 20 Tons per hour.

20Ton Milk Line
500L Yogurt Line
Industrial Applications
Application 1
Application 2
Exhibition & Certification
Exhibition
Factory Visit
Client Site
CE Certificate
ISO Certificate
Patent
Frequently Asked Questions
Do you have reference projects available?
Yes, we have reference projects in most countries. With customer permission, we can provide contact information for factory visits. You are also welcome to visit our factory to see the machines running.
Do you provide overseas after-sales service?
Our engineers are available to travel overseas to provide installation, maintenance, and technical support at your site.
Can the machines be customized?
Absolutely. We design machines according to your specific requirements, including material, power needs, filling types, and bottle specifications, combined with our professional industry experience.
What is the quality guarantee or warranty?
We offer high-quality machinery with a 1-year guarantee and provide life-long technical support for all our equipment.
How long does the installation process take?
Depending on the order complexity, installation typically takes between 10 to 25 days, with one or two engineers assigned to your plant.
Do you provide technical training?
Yes, we provide comprehensive technical training on-site, covering equipment structure, maintenance, control, and operation to ensure your staff can handle the machinery skillfully.

Related Products