Product Overview
Chain and flight elevator divides the materials through the machine and conveys the materials into other machines. It completely solves the accumulation and blocking problems caused by the belt conveyor. The station is equipped with power sockets and tool boxes, making the whole process rapid and orderly. It is typically driven by chain plates.
Product Features
- High transmission efficiency: Materials flow in the whole machine, allowing small-scale machines to transport large volumes.
- Low energy consumption: Conveys materials via friction (no friction between chains and chassis), saving about 40% electric power compared to screw conveyors.
- Low failure rate: Chains are made of alloy steel under heat treatment with a service life of 3 years. Minimal lubrication points.
Product Parameters
Applications: To elevate and convey fruits like tomatoes, apples, mangos or peaches.
Major Materials: SUS 304 / (or customization)
| Model |
Capacity |
Rated Power |
Dimensions (mm) |
| JP-P-YS-001-5T |
5 Ton/H |
1.5 |
3000 x 1000 x 900 |
| JP-P-YS-001-10T |
10 Ton/H |
3 |
3000 x 1200 x 900 |
| JP-P-YS-001-15T |
15 Ton/H |
4 |
4000 x 1200 x 900 |
Processing Solutions We Offer
We provide comprehensive processing lines for various fruit treatments including:
- Fruit juice, syrup, pulp, puree, paste, concentrated juice, jam, jelly.
- Bottled fruit, dried fruit, fried fruits, crystallized fruit, pickled fruit.
- Fruit extracts, fruit powder, pectin, essences, oil.
- Fruit spirits, vinegar, leather bars, and snacks.
Why Choose Our Solutions?
With over 40 years of expertise and 300+ history projects worldwide, we ensure safe, stable, and high-quality operation.
Top Brand Components: We utilize world-class hardware like Siemens PLC, ABB motors, and Spirax Sarco valves.
Frequently Asked Questions
1. What preparations are needed before purchasing a production line?
You should secure necessary import licenses, ensure factory land with water, electricity, and fuel supply, and conduct a detailed market feasibility study to control risks and costs.
2. What information is required for an accurate inquiry?
Please provide the type of raw materials you wish to treat, the desired final products, the required hourly capacity, and your estimated budget range.
3. What is the typical lead time for an order?
Normally, manufacturing takes 60-90 working days, followed by 30 days for shipping and another 30 days for installation. We recommend contacting us at least 6 months in advance.
4. What technical support is provided after purchase?
We provide overseas engineers for installation, commissioning, and intensive training for your local workers on operation, cleaning, maintenance, and repairs.
5. Can the processing line handle multiple types of products?
Yes, our designs emphasize versatility, ensuring one processing line can be adapted for multiple functions and various product modifications.
6. What value-added services are available before ordering?
Customers can access process know-how, pre-investment studies, feasibility reports, detailed engineering plans, and raw material testing in our specialized labs.