Product Overview
Brush Washer consists of a frame, driving speed reducer, circulation pump, water tank, and spray pipes. Fruits and vegetables are conveyed into the machine evenly, cleaned, and pushed forward by brushes driven by a drive reducer. It can be designed as a single-layer or double-layer system upon request.
Technical Parameters
- Item No: JP-P-QX-103
- Applications: Suitable for spherical or bar-shaped fruit.
- Major Materials: SUS 304 / (or customization).
Product Features
- Novel structure, energy efficiency, and high production efficiency.
- Thorough cleaning with minimal damage to fruits and vegetables.
- Wide range of industrial applications.
| Model |
Capacity |
Rated Power |
Dimensions |
| JP-P-QX-103-5T | 5 Ton/H | 2.2 | 1500x1100x900 |
| JP-P-QX-103-10T | 10 Ton/H | 3 | 2000x1100xH |
| JP-P-QX-103-15T | 15 Ton/H | 4 | 2500x1100xH |
Why Choose Our Solutions?
Proven Global Experience
With over 40 years of expertise, we have completed more than 300 fruit juice, jam, and plant extract production lines worldwide. Our systems are built on the principles of safety, stability, and high-quality long-term operation.
Turnkey Solutions & Versatility
From A to Z, we provide tailored scientific solutions. Our designs ensure versatility, allowing one processing line to serve multiple functions, making it easy to adapt to changing market habits.
Top-Tier Hardware
We utilize world-class components: Siemens PLC, Spirax Sarco valves, ABB motors, and Messalina refractometers to ensure precision and durability.
Frequently Asked Questions
What should be prepared before purchasing a production line?
You should have the necessary business licenses, factory land with water/electricity/fuel access, and a target market research or feasibility study to control risks.
What information is needed for an accurate inquiry?
Please provide the raw materials you wish to treat, the desired final product, your required hourly capacity, and an estimated budget range.
What services are provided before an order is placed?
We provide process know-how, pre-investment studies, feasibility reports, detailed engineering plans, and raw material testing in our lab.
What does the turnkey ordering process look like?
The process includes inquiry confirmation, engineering design, manufacturing, assembly and site testing, sea shipping, and overseas installation by our engineers.
How long does the entire manufacturing and installation process take?
Typically, manufacturing takes 60-90 working days, followed by 30 days for shipping and 30 days for installation and training. We recommend contacting us 6 months in advance.
Do you provide training for local workers?
Yes, our engineers provide comprehensive training on how to operate, clean, maintain, and repair all machines until your local team is fully proficient.