High Quality Automatic Beverages Mixing and Batching Process System with Pasteurizer and CIP System Juice Milk Blending Mixing Tanks Batching Equipment

Customization: Available
After-sales Service: Lifetime Service
Warranty: 3 Years

Product Description

i

Basic Specifications

Model NO.
7000L
Condition
New
Customized
Customized
Volume
Customized
Material
Stainless Steel
Transport Package
Export Package
Origin
China
Production Capacity
1000 pieces/Year

Product Description

Processing System 1
Processing System 2
Processing System 3
Processing System 4
The juice beverage batching system is mainly used for the automatic production and batching of various juices, carbonated drinks, RTD drinks and non carbonated beverages. The entire system mainly includes high-speed shear mixing tanks, batching tanks, filter machine, homogenizer, instantaneous sterilizer, CO2 mixer, temporary storage tank, pipeline system, control system, water treatment system, CIP cleaning system, etc.
All equipment and pipelines that come into contact with beverages and water are made of sanitary grade SS304 or 316L. The system operates with strict sanitary standards and can be controlled semi-automatically or fully automatically.
Batching Equipment 1
Batching Equipment 2

Working Steps & Process

  • 01.
    Mixing: Beverage additives (pectin, puree, etc.) are added to the shear mixing tank. Mixing time is adjustable via touch screen.
  • 02.
    Batching: Ingredients are pumped to batching tanks. High-precision flow meters control syrup and water ratios automatically.
  • 03.
    Sterilization: Beverages pass through a filter and then a fully automatic flash sterilizer with precise temperature control.
  • 04.
    Storage: Carbonated drinks go through a CO2 mixer, while others go directly to finished storage tanks for filling.
System Diagram
Detailed Component
Control System
Stainless Steel Tank

After Sales Service

Standard Warranty: 36 months.

Extended Warranty: Optional coverage up to 60 months.

Global Support: 24/7 technical assistance and spare parts supply.

Training: On-site or remote operation/maintenance training.

Service 1
Service 2
Service 3
Service 4
Packaging
?

Frequently Asked Questions

What's the lead time for orders?
Tanks ship in 15–30 days; complete brewing systems require 30–60 days.
Do you provide after-sales service overseas?
Yes, we provide global 24/7 technical assistance and on-site training.
Can I request a customized size?
Absolutely! All systems can be customized and produced according to specific client requirements.
What documents do you provide for export?
We provide Commercial Invoice, Packing List, Bill of Lading, and other necessary export documentation.
What materials are used in the system?
All equipment and pipelines that come into contact with beverages are made of sanitary grade SS304 or 316L stainless steel.
How is the sterilization process controlled?
The entire sterilization process is fully automated with automatic detection to ensure predetermined requirements are met.

Related Products